Tmc POOLED FUND WEBSITE IMAGE
spacer.gif (845 bytes)

Overview


Meetings


Projects

 Current Projects
 Completed Projects
 Projects to be Initiated
 Other National Operations Related Projects
 Ideas for Future Projects

Members


Related Links

Site Map

Search

Projects
Completed Projects
TMC Operator Requirements, Position Descriptions Phase 2 - Interactive Software

The purpose of this project is to take the pertinent information contained in the final report produced for the TMC Pooled Fund Study project "TMC Operator Requirements Matrix" and put into in a format that TMC managers, supervisors, and human resource personnel can use to easily and quickly arrive at the basic knowledge, skill, and ability (KSA) requirements for the operator jobs and associated tasks in their particular TMCs.

This project has been completed.

Contact Information:
To provide feedback and comments, report errors in the software tool and final report, request information or material related to the project, or web site questions contact:
Ming-Shiun Lee: 612-373-6335, Ming_Shiun_Lee@urscorp.com

For additional information, contact:
Tom Granda: 202-493-3365, Thomas.Granda@fhwa.dot.gov

    Interactive Software Tool     Project Reports and Outreach Material
  • TMC Operator Requirements and Position Descriptions Document (Revised Version)    pdf (2,515 KB)
  • Project Report    doc (366 KB)
  • Project Fact Sheet    pdf (339 KB)
  • Project Presentation    ppt (1,154 KB)
  • Functional Requirements Document    doc (277 KB)
  • Software Architecture and Requirements    doc (308 KB)
  • Software Test Report    doc (240 KB)

U.S.  Department of Transportation Federal Highway Administration
FHWA Home | Operations CBU Home | Freeway Management Systems | Travel Management Home | Feedback
Privacy Policy